News · Chips & infrastructure

India says 5 of the 12 chip plants it approved are now in commercial production, as it moves to Semicon 2.0

Two more assembly and packaging lines, in Mohali and Surat, started on 17 September, the government says. It puts Semicon 2.0's budget at $13.5 billion, up from $8 billion.

Catching up: the original came out on . This story was published later, when the site opened.

India says 5 of its 12 approved chip plants are now in commercial production

Grade 1 · Primary

Source: Press Information Bureau, Government of India

What changed
India's government says production lines at CDIL Semiconductor in Mohali and Suchi Semicon in Surat opened on 17 September, making 5 of 12 approved units operational.
Who it affects
Chip assembly, testing and packaging units approved under India's first semiconductor programme, Semicon 1.0; none of the 5 is a wafer fab.
What it does not tell you
How much the plants produce, or whether they are profitable. The count is the government's account of its own programme.

The full story Check the source

India's Prime Minister opened commercial production lines at two chip plants on 17 September, CDIL Semiconductor in Mohali for discrete devices and Suchi Semicon in Surat for packaging, the government said [1].

That makes 5 operational assembly and packaging units out of the 12 approved under its first semiconductor programme, Semicon 1.0, according to the release. The other three are Micron, Kaynes and CG Semi [1].

The government put the budget of the India Semiconductor Mission at $13.5 billion for its second phase, Semicon 2.0, up from $8 billion in the first [1].

What it covers

Units approved under Semicon 1.0, the programme that subsidises chip plants in India. The five operating so far are assembly, testing and packaging plants (ATMP and OSAT), which put finished chips into packages [1].

Semicon 2.0 has six pillars: design, equipment and materials, fabs, advanced packaging, applied research and talent [1].

The release says 70,000 design engineers have been trained under Semicon 1.0, and design software deployed at more than 500 organisations [1].

What it does not tell you

How much the plants produce, or for whom. The release gives no output figures [1].

When the approved wafer fabs, which make the chips themselves, will start production. None of the five operating units is a fab [1].

It is the government's account of its own programme, published at the industry's trade show [1].

Sources and their grades

  1. Press Information Bureau, Government of India, Prime Minister Shri Narendra Modi Inaugurates SEMICON India 2026; Unveils India's Ambitious Roadmap for Transition to Semicon 2.0. Read 29 September 2026. Grade 1 · Primary Posted 17 September 2026, 22:36 IST. The government's own account of its programme: the production figures are not independently reported.

A grade says how much weight a source will take, from 1 (a body that can compel an answer and has nothing to sell) to 5 (somebody describing what they sell, or themselves). The standard sets out what each grade may be used for.

Filed under India, Semiconductors

Comments

Commenting needs an account, made with nothing but an email address. A first comment is read before it appears.

More news

See all